Resources
Read the engineering. Test the proof.
External Black-Box Evaluation — October 2026
Staging-only, synthetic data, commissioned by Trace. 14 PASS / 3 FAIL / 1 BLOCKED across 18 scenarios, with the findings and fixes disclosed. Not a certification.
Request the evaluation packageEvery Decision Begins With Authority — Buyer Brief
For CISOs, enterprise architects, risk, legal and AI program leaders: what an execution-time authority, governance and evidence layer does, why AI agents need it, what Trace proves today, the stated limits, and what a scoped pilot looks like. Version 6 · November 2026. Includes outcome verification, conflicting evidence, saved historical views and the customer deployment boundary.
Technical Brief
Version 10 · November 2026. Current APIs, signed and conflicting outcome evidence, saved historical reconstruction, enforcement coverage, security repairs and exact verification limits.
Architecture Brief
Version 7 · November 2026. Current execution, evidence and historical-capture boundaries, atomic signed intake, customer responsibilities and the fresh 633-test / 838-database-test verification record. Hosted external-action provisioning remains separately stated.
Enterprise Pilot, Technical FAQ & Security Questionnaire
November 2026. A controlled pilot plan, current technical answers, deployment checklist, outcome-evidence and coverage definitions, security-repair record and explicit limitations.
Evidence Timeline
Review how decisions become verifiable records.
Independent Security & Architecture Evaluation
August 22, 2026 · Chimezie Emmanuel Uzochukwu, Independent Security & Architecture Reviewer
An independent functional, adversarial, and architectural evaluation of the Trace Continuity Sandbox covering runtime authority revocation, governed writes, PII handling and tokenization, safe retrieval, audit evidence, fail-closed behavior, and adversarial payload testing.
The evaluation documents the testing performed, results, limitations, weaknesses, recommendations, and the evaluator’s scoped technical conclusion. It is an independent evaluation, not a certification or a guarantee of security, and it is separate from the Run 1 / Run 2 qualification testing. An earlier, separate review — see October 2026 for the current evaluation.
View Independent Evaluation (PDF)U.S. Provisional Patent Application No. 64/137,172
Filed August 20, 2026
Governed Memory and Execution Control with Cryptographic Authority Lineage, Material-State Admissibility, and Disclosure-Time Effect Boundary
This filing covers Trace Continuity Labs’ governed memory and execution-control architecture, including cryptographic authority lineage, separate authority and material-state admissibility determinations, retrieval-time re-evaluation, and the disclosure-time Effect Boundary.
